← Back to executions list

Indoor pool and whirlpool in Studénka

Studénka, Czech Republic

www.sak-studenka.cz

Where:Studénka
When:05-10/2022
What:Indoor pool and Whirlpool
Swimming pool technology costs:2,1 mil. CZK without VAT
Total area of the pools:87,0 m2
Total volume of the pools:101,8 m3

In Studénka we can find a sports centre which is a part of the winter stadium. As the centre wanted to reconstruct the pool and build a whirlpool, the installations and construction modifications were provided by our team.

 

The stainless swimming pool is of an area of 17 x 4,8 x 1,2m and thanks to the reconstruction, the pool is accessible from three sides. Next to the pool is an ideal place for relax, because of a stainless whirlpool of an area of 3,8 x 1,8 x 1,0m. The attractions of the whirlpool are: wall-mounted back massage jets, a tune bench with air massagers and a pearl gout.

 

The pool water treatment is divided into two water circuits. Each circuit includes concrete equalization tanks (the swimming pool tank is equipped with a pool film), circulation pumps, pressure filters with multi-layer filter filling and automatic chemical dosing equipment. To ensure effective filtration, a flocculating agent is automatically dosed before the filter, which causes very small dirt particles to form larger particles (flakes), which can already be captured on the filter. For proper disinfection and flocculation, the pH is adjusted as needed. In order to achieve high quality pool water, the water treatment system incorporates effective disinfection in the form of a UV lamp, which eliminates the content of bound chlorine.

 

G-Team INOX SERVIS was responsible for the delivery and installation of the pool equipment and piping systems for the pool. The above services were rendered by G-Team INOX SERVIS for Berndorf Bäderbau s.r.o. under a pertinent contract.

sample
sample
sample
sample
sample
sample
sample
sample
sample
sample